Gas Industry

Submerged Combustion Vaporizer(S.C.V)

LNG supplied from an LNG ship is being stored in the LNG tank in LNG Terminal at extremely low temperature(-165℃ or below), and the Submerged Combustion vaporizer is used to convert LNG to NG before it is supplied to power plants and city gas users. All parts that contact with LNG are made of corrosion-resistant stainless steel and our environmentally friendly design minimizes NOx and CO emissions with providing close to 100% thermal efficiency.

Korea LNG Receiving Terminal Project
Owner Korea Gas Corporation
Customer Korea Gas Corporation
Country Korea
Year 2001 ~ Present
Remarks 61 Sets
China LNG Receiving Terminal Project
Owner Beijing Gas, Shanghai Gas, PipeChina, SINOPEC, PetroChina,
Customer HPC, COOEC, SEI
Country China
Year 2012 ~ Present
Remarks 42 Sets
Major Experience
No. Project Owner Customer Country Year Remarks
1 CNOOC Tianjin LNG
Phase II PJT
CNOOC PipeChina China 2021 169.26 Ton/hr x 1 Set,
220 Ton/hr x 3 Sets
2 CNOOC Jiangsu Binhai LNG PJT JSLNG CNOOC China 2021 189 Ton/hr x 2 Sets
3 Beijing Gas Tianjin Nangang PJT Beijing Gas Beijing Gas China 2021 231 Ton/hr x 7 Sets
4 Sinopec Tianjin Phase ll PJT SINOPEC SINOPEC China 2019 196 Ton/hr x 2 Sets
5 Tangshan LNG Expansion Terminal PJT PETROCHINA HQC China 2019 215 Ton/hr x 1 Set
6 Shanghai LNG Expansion Terminal PJT CNOOC Shanghai LNG China 2018 215.5 Ton/hr x 1 Set
7 Al-Zour LNG Import PJT KNPC Hyundai Engineering Kuwait 2018 200 Ton/hr x 3 Sets
8 Jeju Aewol LNG Receiving Terminal PJT KOGAS KOGAS Korea 2018 60 Ton/hr x 1 Set
9 Incheon LNG Terminal PJT KOGAS KOGAS Korea 2001 ~ 2017 29 Sets
10 Yangling LNG Expansion PJT Shaanxi Gas Shaanxi Gas China 2016 180 Ton/hr x 1 Set
11 Tianjin LNG PJT CNOOC CNOOC China 2016 170 Ton/hr x 3 Sets
12 Yangling LNG PJT Shaanxi Gas Shaanxi Gas China 2015 110 Ton/hr x 1 Set
13 Tianjin LNG PJT SINOPEC SINOPEC China 2015 196 Ton/hr x 4 Sets
14 Pyeongtaek LNG Receiving Terminal PJT KOGAS KOGAS Korea 2004 ~ 2014 19 Sets
15 Samcheok LNG Receiving Terminal KOGAS KOGAS Korea 2013 120 Ton/hr x 2 Sets
16 Petro Tangshan Phase 1, 2 PETROCHINA SMT China 2012 ~ 2014 201 Ton/hr x 8 Sets
17 Tongyoung LNG Receiving Terminal KOGAS KOGAS Korea 2001 ~ 2013 8 Sets
18 Ningbo SCV PJT NINGBO LNG TERMINAL SPP / SMT China 2010 175 Ton/hr x 2 Sets
19 Gulf LNG PJT AKER Solution LINDE(SFPC) USA 2009 100~153 Ton/hr x 10 Sets
20 Gwangyang LNG Receiving Terminal KOGAS KOGAS Korea 2004 130 Ton/hr x 1 Set
Mobile Vaporizer

The mobile vaporizer is designed and manufactured to enable quick gas supply in case that the governor station has a problem with gas supply. Or, it can be used to supply a small amount of gas to islands areas or isolated areas. It is a new conceptual vaporizer that can vaporize 5 tons of LNG per hour to enable speedy loading/conveyance through the trailer.

Mobile Natural Gas Supply Package Project
Owner Korea Gas Corporation
Customer Korea Gas Corporation
Country Korea
Year 2017
Remarks 5 Ton/hr x 1 Set
Recondenser

With the world’s best unique technology, our recondenser is made of vertical stainless steel materials and it is a facility used to mix LNG with BOG naturally generated in the LNG tank of the LNG terminal or FRSU and then re-liquidify it, and it is installed between the lower pressure LNG pump and the high pressure LNG pump.

MOL LNG FSRU Project
Owner MOL
Customer DSME
Country Uruguay
Year 2015
Remarks 50 Ton/hr x 1 Set
TongYoung LNG Receiving Terminal Project
Owner Korea Gas Corporation
Customer Korea Gas Corporation
Country Korea
Year 2008
Remarks Min.1.2 Ton/hr ~ Max.21 Ton/hr x 2 Sets
Major Experience
No. Project Owner Customer Country Year Remarks
1 TongYoung
LNG Receiving Terminal PJT
KOGAS KOGAS Korea 2008 Min.1.2 Ton/hr ~ Max.21 Ton/hr
x 2 Sets
2 SLNG Terminal PJT SLNG Samsung C&T Singapore 2011 50 Ton/hr x 1 Set
3 EXECELERATE 173, 000M3
LNG-RV-FSRU PJT
EXCELERATE
ENERGY
DSME Brazil 2013 7.4 Ton/hr x 1 Set
4 MOL LNG FSRU PJT MOL DSME Uruguay 2015 50 Ton/hr x 1 Set
5 Panama LNG Terminal PJT AES Corporation POSCO E&C Panama 2017 Min. 1.6 Ton/hr ~ Max. 4.8 Ton/hr
x 1 Set
6 Pyeongtaek
Terminal Revamping PJT
KOGAS Daewoo E&C Korea 2018 40 Ton/hr x 1 Set
Gas Heater

In order to convert the high pressure natural gas supplied from the LNG production site to power plants and city gas companies at proper pressure levels, pressure control, in other words, depressurization is needed. When the pressure is reduced, due to the Joule-Thomson effects, temperature is decreased, and thus in order to prevent freezing accidents to pipes and metering facilities caused by ice formed near pipes, the device can pre-heat it to proper temperature, thus compensating for temperature losses due to depressurization.

Korea governor station Project
Owner Korea Gas Corporation
Customer Korea Gas Corporation
Country Korea
Year 1995 ~ Present
Remarks 50/100/150/200/250 Ton/hr (285 Sets)
Biskra SCPP Project( Algeria)
Owner SPE
Customer Hanwha E&C
Country Algeria
Year 2014
Remarks 81.6 Ton/hr x 5 Sets
Major Experience
No. Project Owner Customer Country Year Remarks
1 Korea Governor Station KOGAS KOGAS Korea 1995 ~ Present 50/100/150/200/250 Ton/hr
2 Boryeong LNG
Terminal Phase 2 PJT
Boryeong LNG Terminal GS E&C Korea 2019 84 Ton/hr x 1 Set
3 Daesan E1 PJT E1 GS E&C Korea 2018 32.6 Ton/hr x 2 Sets
4 Ashuganj 225MW
CCPP PJT
Ashuganj Power Station
Company Limited.
Hyundai Engineering Bangladesh 2016 51 Ton/hr x 1 Set
5 Incheon LNG Terminal PJT KOGAS KOGAS Korea 2016 115 Ton/hr x 1 Set
6 Boryeong LNG
Terminal Phase 1 PJT
Boryeong LNG Terminal GS E&C Korea 2015 84 Ton/hr x 2 Sets
7 Ras Djinet
1,131.1MW CCPP PJT
SPE Daewoo E&C Algeria 2014 78.5 Ton/hr x 2 Sets
8 Biskra SCPP PJT SPE Hanwha E&C Algeria 2014 81.6 Ton/hr x 5 Sets
9 Ras Djinet 1,131.1MW CCPP PJT SPE Daewoo E&C Algeria 2014 78.5 Ton/hr x 2 Sets
10 Shuweihat S3 IPP PJT ADEWA Daewoo E&C U.A.E 2012 45.89 Ton/hr x 5 Sets
11 Al Khaliji 4X350MW
Power Plant PJT
Libya General
Elec.Co
Hyundai E&C Libya 2010 60 Ton/hr x 3 Sets
Gas Filter

Gas filter is installed at the front side of the gas filter to remove alien substances, water, and dusts contained in the natural gas, thus playing the role of protecting the accessories of the gas heater.

Korea Governor Station Project
Owner Korea Gas Corporation
Customer Korea Gas Corporation
Country Korea
Year 1994 ~ Present
Remarks 50/100/150/200/250 Ton/hr
Al Qatrana Power Project
Owner Qatrana Electric Power Company
Customer Lotte E&C
Country Jordan
Year 2010
Remarks 41 Ton/hr x 4 Sets
Major Experience
No. Project Owner Customer Country Year Remarks
1 Al Qatrana Power PJT Qatrana
Electric Power Company
Lotte E&C Jordan 2010 41 Ton/hr x 4 Sets
2 SLNG Terminal PJT SLNG Samsung C&T Singapore 2011 168 Ton/hr x 2 Sets
3 Boryeong LNG Terminal PJT Boryeong LNG Terminal Boryeong LNG Terminal Korea 2015 1,396 Ton/hr x 2 Sets
4 Governor Station KOGAS KOGAS Korea 2003 ~ Present 50/100/150/200/250 Ton/hr