Power Plant
Fuel Gas Supply System
The fuel gas supply system plays the role of receiving natural gas from the pipe lines and refining it and adjusting its temperature and pressure, so that it can be reliably supplied to the steam generator and the gas turbine. The fuel gas supply system generally consists of ESDV, Gas Filter, Gas Heater, PR Station, Metering System and Analyzer.
Shuweihat S3 IPP Projec
Owner | ADEWA |
---|---|
Customer | Daewoo E&C |
Country | UAE |
Year | 2012 |
Remarks | 324 Ton/hr |
Biskra Simple Cycle Power Plant Project
Owner | SPE |
---|---|
Country | Algeria |
Year | 2014 |
Remarks | 134 Ton/hr |
Major Experience
No. | Project | Owner | Customer | Country | Year | Remarks |
---|---|---|---|---|---|---|
1 | Hanlim CCPP Pjt | KOSPO | Byucksan Engineering | Korea | 2019 | 19.3 Ton/hr |
2 | Pyung hae Governor Station Pjt | KOGAS | KOGAS | Korea | 2018 | 1.2 Ton/hr |
3 | Biskra Simple Cycle Power Plant PJT | Hanhwa E&C | SPE | Algeria | 2014 | 134 Ton/hr |
4 | Ras Djinet 1,131.1MW CCPP PJT | Daewoo E&C | SPE | Algeria | 2014 | 202 Ton/hr |
5 | Nainawa CCPP PJT | Ministri Of Electricity, Iraq | Calik Energi | Iraq | 2013 | 178 Ton/hr |
6 | Al-Kharait CCPP PJT | Ministri Of Electricity, Iraq | Calik Energi | Iraq | 2013 | 317 Ton/hr |
7 | Qurayyah Independent Power PJT | Saudi Electricity Cooperation | Samsung C&T | Saudi Arabia | 2013 | 658 Ton/hr |
8 | TAZA Gas Turbine Power Plant PJT | Ministri Of Electricity, Iraq | Hyundai Engineering | Iraq | 2012 | 55 Ton/hr |
9 | Rumaila Gas Turbine Power Plant PJT | Ministri Of Electricity, Iraq | Hyundai Engineering | Iraq | 2012 | 275 Ton/hr |
10 | Al Qatrana Power PJT | NEPCO | Lotte E&C | Jordan | 2010 | 79.2 Ton/hr |
11 | Al Khalij 4 X 350 MW CCPP PJT | Libya GECOL | Hyundai E&C | Libya | 2010 | 302 Ton/hr |
GT Ignition System
The GT ignition system package is a device used for an initial ignition to operate the gas turbine within the combined cycle thermal power plant. It can deliver the exactly necessary amount of fuel for an initial ignition at the exact time of need at stable pressure and temperature. Relevant tools and accessories are provided in a package.
Shoaiba CCPP Project
Owner | SEC |
---|---|
Customer | DL E&C |
Country | Saudi Arabia |
Year | 2012 |
Remarks | Size (ID x L) : 1,400 x 4,870 |
Misurata & Benghazi CCPP Project
Owner | Upper Egypt Electricity Production Company |
---|---|
Customer | Daewoo E&C |
Country | Libya |
Year | 2009 |
Remarks | Size (ID x L) 2,500 x 6,900 |
Major Experience
No. | Project | Owner | Customer | Country | Year | Remarks |
---|---|---|---|---|---|---|
1 | Shoaiba CCPP PJT | SEC | DL E&C | Saudi Arabia | 2012 | Size (ID x L) : 1,400 x 4,870 |
2 | Oman Sur IPP PJT | GECOL | Daewoo E&C | Oman | 2012 | Size (ID x L) : 1,522 x 4,870 |
3 | Shuweihat 3 IPP PJT | Simens | Daewoo E&C | Abu Dhabi | 2012 | Size (ID x L) : 1,260 x 4,870 |
4 | Misurata & Benghazi CCPP PJT | Upper Egypt Electricity Production Company | Daewoo E&C | Libya | 2009 | Size (ID x L) : 2,500 x 6,900 |
Electric Heater
Similar to the gas heater system, electric heater compensates termperature loss due to pressure drop by preheating the gas to an appropriate termperature to prevent freezing of piping and instrumentation equipment. An electrical heater using electricity as the source of heat has high responsiveness that enables to heat gas very quickly.
Al Qatrana Power Project
Owner | NEPCO |
---|---|
Customer | Lotte E&C |
Country | Jordan |
Year | 2010 |
Remarks | 1,700 kW x 3 Sets |
Incheon LNG Receiving Terminal Project
Owner | KOGAS |
---|---|
Customer | KOGAS |
Country | Korea |
Year | 2016 ~ 2017 |
Remarks | 110 kW x 3 Sets |
Major Experience
No. | Project | Owner | Customer | Country | Year | Remarks |
---|---|---|---|---|---|---|
1 | Buyeo / Chungyang Governor Station PJT | KOGAS | KOGAS | Korea | 2020 | 156 kW x 4 Sets |
2 | KZ CCPP PJT | Korea Zinc. Co | Korea Zinc. Co | Korea | 2020 | 400 kW x 3 Sets |
3 | Hanrim Governor Station PJT | KOGAS | KOGAS | Korea | 2019 | 80.5 kW x 3 Sets |
4 | Jeongyang Governor Station PJT | KOGAS | KOGAS | Korea | 2018 | 309 kW x 3 Sets |
5 | Incheon LNG Terminal PJT (Sector.4) | KOGAS | Hanyang | Korea | 2017 | 110 kW x 1 Sets |
6 | Incheon LNG Terminal PJT (Sector.4) | KOGAS | GS E&C | Korea | 2017 | 110 kW x 2 Sets |
7 | Incheon LNG Terminal PJT (Sector.4) | KOGAS | GS E&C / Hanyang | Korea | 2016 ~2017 | 110 kW x 3 Sets |
8 | Algeria Biskra SCPP PJT | SPE | Hanhwa E&C | Algeria | 2014 | 1,250 kW x 2 Sets |
9 | Incheon LNG Terminal PJT | KOGAS | Hyundai E&C | Korea | 2013 | 350 kW x 1 Set |
10 | SLNG Terminal PJT | SLNG | Samsung C&T | Singapore | 2011 | 50 kW x 1 Set |
11 | Al Qatrana Power PJT | NEPCO | Lotte E&C | Jordan | 2010 | 1,700 kW x 3 Sets |
12 | Yulchon Cycle Power PJT | MEIYA YULCHON | Hyundai E&C | Korea | 2003 | 1,200 kW x 1 Set |